29 Blog found
Historical H3C S6500 troubleshooting case showing two healthy Layer 3 uplinks but only one carrying meaningful traffic because the expected route for the second path was missing.
Magyar Telekom IPTV data-center power planning case showing a measured 25-meter -48V route from the existing DC source to a new PDF cabinet serving nine equipment racks.
Myanmar Telenor mobile transport capacity diagram showing traffic aggregation driving planned capacity from GE microwave uplinks to 10GE access, 40GE aggregation and 200GE backbone transport.
Myanmar Telenor 4G transport planning map showing layered radio sites, core sites, microwave links, existing fiber and WDM resources used to create physical network paths.
Myanmar Telenor 4G planning scene showing RF candidate locations checked against existing telecom sites before deciding whether new construction was required.
Vivacom VDSL upgrade diagram showing a new remote access site closer to subscribers to shorten the existing copper loop while using fiber for the upstream connection.
High-density university venue showing multiple AP coverage zones planned at approximately 30 meters instead of the project’s ~100-meter ideal open-space coverage reference.
Huawei AirEngine 6776-56TP access point shown changing from 3radio to 2radio-standard mode through a wireless controller.
Huawei S5735-S and S5735-S-V2 switches shown as incompatible stack members because they use VRP V200 and V600 platforms.
Huawei AirEngine 5760-51 access point shown with Fit, Fat and Cloud management paths to a controller, local laptop and cloud platform.