After the RAN and core sites were defined, we still needed a physical path between them. In the Myanmar Telenor project, we separated radio sites, microwave, fiber, WDM and transport locations into map layers, then combined those layers to reuse existing resources, identify aggregation points and fill connectivity gaps.
Engineer Lab
1 Blog found