In the Myanmar Telenor project, transport links were not sized from downstream port speed alone. As radio-site traffic converged toward the core, required capacity increased from generally GE at microwave, to 10GE access, 40GE aggregation and 200GE planned backbone transport, with expansion interfaces reserved at convergence points.
Engineer Lab
1 Blog found